How many shop drawings should the Contractor prepare and submit for the Owner's approval?

The Contractor shall submit two (2) copies of all shop or setting drawings, templates, patterns and models. Submission of shop drawings shall be accompanied by a letter of transmittal in duplicate (two copies), containing the name of the project, the Contractor's name, number drawings, titles, and other pertinent data.

 

If the shop drawings show variations from the Contract requirements because of standard shop practice or other reasons, the Contractor shall make specific mention of such variations in his letter of submittal.