Who is responsible for adequacy of the design and sufficiency of the drawings and specifications?

Generally, the Owner shall be fully responsible for the adequacy of the design and for sufficiency of the Drawings and Specifications.

 

However, if any part or whole of the Works, when agreed upon, are to be designed by the Contractor, then all responsibilities assigned to the Owner for such design shall automatically be assigned to the Contractor.